Project Details

Client

City of Indianapolis Market Correctional Government Office Parking Joint Venture AECOM Hunt (formerly Hunt Construction Group) Architect K2M Design Delivery Method Design-build Size 800,000-sf Expected Completion 2022

Market

Correctional, Government, Office, Parking

Architect

K2M Design | Joint Venture: AECOM Hunt (formerly Hunt Construction Group)

Delivery Method

Design-build

Highlights

Expected Completion 2022

Size

800,000 sq ft

Community Justice Campus – Adult Detention Center and Sheriff’s Administration Offices

Indianapolis, Indiana

The 800,000-sf project broke ground in 2018 and is expected to be completed in 2022 on the Community Justice Campus located in Indianapolis, Indiana. The scope of work consists of a 3,000-bed Adult Detention Center, a 3-story Sheriff’s Administration Office, and a 11-story Courthouse that are all being built at the same time. The new Justice Facility has an approximate 450,000-sf structural precast concrete frame and the detention cell structure types consist of modular steel cell units, truss-built wall panel systems, and masonry walls.

 



Columbus - HQ

1907 Leonard Ave.

Columbus, OH 43219

Indianapolis

2001 West 18th Street

Indianapolis, IN 46202

Copyright © 2024 The Smoot Construction Company. All rights Reserved. An Equal Opportunity Employer. Web Powered by DevQ