This project involved the complete renovation of a 12-story, 366,000 square-foot building and included the removal and reconstruction of the entire H Street facade. The first floor renovation included new store fronts for retail tenants, new office areas, a renovated main entrance lobby and the addition of a new exercise facility for use by tenants. Work on the upper floors involved the installation of new elevator lobbies and totally renovated restrooms with spacious vestibules and new plumbing fixtures throughout. All eight elevators in the core were refurbished with new cabs and equipment.
With the exception of the cooling towers, all mechanical equipment was replaced. Below sill heating units are positioned along the perimeter walls and in the atrium. New heating and air conditioning ducts were installed through the ceilings. In addition, new plumbing fixtures and piping were provided throughout, and the building’s electrical system was totally replaced.